Lead water pipes in New Mexico
EPA estimate for New Mexico
409
lead or galvanized-requiring-replacement service lines · #49 in the US
Lead
21
Galvanized to replace
388
All service lines
663,724
Share needing replacement
0.1%
Source: US EPA 2025 updated service line projections (September 2025), based on inventories states submitted. Unknown lines are allocated by EPA's method.
Lead service lines
370
Galvanized requiring replacement
60
Material unknown
331,039
Water systems
55
Source: US EPA 7th Drinking Water Needs Survey (2024 update), data retrieved November 19, 2026. Systems are sorted by number of lead lines. This covers the larger water systems EPA surveyed; smaller systems are not listed yet, but the address check above works for every system.
*Galvanized service lines. Totals cover each whole water system, not a single address.